For residential, commercial, industrial, institutional
Dadra & Nagar Haveli and Daman & Diu Solar Energy Policy 2022
Dadra & Nagar Haveli, Daman, Diu · Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL
For residential, commercial, industrial, institutional in Dadra & Nagar Haveli, Daman, Diu — this guide covers the Dadra & Nagar Haveli and Daman & Diu Solar Energy Policy
Administered by Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL. Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- DNH & DD UT additional: 20% UT subsidy
- Industrial solar: accelerated depreciation
- wheeling charges waiver
- Diu Island: solar
- BESS priority (island energy security)
Authority and scope
- Government body: Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL
- Nodal agency: Dept. of Power, DNH & DD UT
- Eligible for: residential, commercial, industrial, institutional
- Installation type: Rooftop on-grid + industrial ground-mounted (GIDC) + island solar + BESS (Diu)
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; industrial GIDC tenants get simplified single-window approval.
- Disbursement timeline: 30–45 days post-commissioning
- Disbursement mode: DBT via UT Power Dept.; central CFA via DPDCL/DESL
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: JERC (DNH & DD chapter) Net Metering Regulations
- 1 kW–500 kW. DISCOM: DPDCL (Dadra & Nagar Haveli Power Distribution Co. Ltd.) for DNH. Daman: DESL. Diu: DGVCL (Gujarat) overlap + UT admin.
- Gross metering policy: JERC gross metering for >500 kW. Feed-in tariff per JERC order.
- Hybrid policy: Diu Island Solar + BESS: island energy security initiative. Diu target: 100% solar by
• DISCOM requirements: DPDCL: Dadra & Nagar Haveli. DESL (Daman Electricity Supply): Daman. Diu: UT electricity dept. Silvassa GIDC: DPDCL fast-track industrial connections.
How to apply
Apply on DNH & DD UT portal or pmsuryaghar.gov.in
Select territory (Silvassa/Daman/Diu)
UT-empanelled vendor selection
Installation + net meter
DISCOM inspection + commissioning
UT subsidy + central CFA via DBT
Documents required
- Aadhaar card
- Electricity bill (DPDCL/DESL consumer number)
- Property documents (sale deed / lease agreement)
- Bank account details
- Industrial licence (for GIDC applicants)
Additional details
- Scheme budget: DNH & DD RE target: 100 MW solar by
- Industrial solar: key focus given Silvassa GIDC industrial area.
- Target beneficiaries: All DNH & DD consumers. Key areas: Silvassa (396xxx), Daman (396xxx), Diu (362xxx). Industrial consumers in Silvassa GIDC: major target for commercial solar.
- Progress: DNH & DD: 50+ MW solar installed (April 2025). Silvassa GIDC industrial rooftop solar: 20+ MW. Diu Island: 50%+ solar in grid mix (pilot island solar-diesel hybrid).