Back to subsidies

For residential, commercial, industrial, institutional

Dadra & Nagar Haveli and Daman & Diu Solar Energy Policy 2022

Dadra & Nagar Haveli, Daman, Diu · Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL

Solar energy — Dadra & Nagar Haveli and Daman & Diu Solar Energy Policy 2022

For residential, commercial, industrial, institutional in Dadra & Nagar Haveli, Daman, Diu — this guide covers the Dadra & Nagar Haveli and Daman & Diu Solar Energy Policy

Administered by Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL. Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • DNH & DD UT additional: 20% UT subsidy
  • Industrial solar: accelerated depreciation
  • wheeling charges waiver
  • Diu Island: solar
  • BESS priority (island energy security)

Authority and scope

  • Government body: Dept. of Power, Dadra & Nagar Haveli and Daman & Diu UT Administration / DPDCL
  • Nodal agency: Dept. of Power, DNH & DD UT
  • Eligible for: residential, commercial, industrial, institutional
  • Installation type: Rooftop on-grid + industrial ground-mounted (GIDC) + island solar + BESS (Diu)

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction; industrial GIDC tenants get simplified single-window approval.
  • Disbursement timeline: 30–45 days post-commissioning
  • Disbursement mode: DBT via UT Power Dept.; central CFA via DPDCL/DESL
  • Maximum capacity: 500 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: JERC (DNH & DD chapter) Net Metering Regulations
  • 1 kW–500 kW. DISCOM: DPDCL (Dadra & Nagar Haveli Power Distribution Co. Ltd.) for DNH. Daman: DESL. Diu: DGVCL (Gujarat) overlap + UT admin.
  • Gross metering policy: JERC gross metering for >500 kW. Feed-in tariff per JERC order.
  • Hybrid policy: Diu Island Solar + BESS: island energy security initiative. Diu target: 100% solar by

• DISCOM requirements: DPDCL: Dadra & Nagar Haveli. DESL (Daman Electricity Supply): Daman. Diu: UT electricity dept. Silvassa GIDC: DPDCL fast-track industrial connections.

How to apply

Apply on DNH & DD UT portal or pmsuryaghar.gov.in

Select territory (Silvassa/Daman/Diu)

UT-empanelled vendor selection

Installation + net meter

DISCOM inspection + commissioning

UT subsidy + central CFA via DBT

Documents required

  • Aadhaar card
  • Electricity bill (DPDCL/DESL consumer number)
  • Property documents (sale deed / lease agreement)
  • Bank account details
  • Industrial licence (for GIDC applicants)

Additional details

  • Scheme budget: DNH & DD RE target: 100 MW solar by
  • Industrial solar: key focus given Silvassa GIDC industrial area.
  • Target beneficiaries: All DNH & DD consumers. Key areas: Silvassa (396xxx), Daman (396xxx), Diu (362xxx). Industrial consumers in Silvassa GIDC: major target for commercial solar.
  • Progress: DNH & DD: 50+ MW solar installed (April 2025). Silvassa GIDC industrial rooftop solar: 20+ MW. Diu Island: 50%+ solar in grid mix (pilot island solar-diesel hybrid).