Back to subsidies

For residential, commercial, industrial, agricultural, institutional

Madhya Pradesh Solar Energy Policy 2022 / MP Rooftop Solar Programme (MPUVNL / MPNEDA)

Madhya Pradesh · MP Urja Vikas Nigam Ltd (MPUVNL) / MP New and Renewable Energy Development Agency (MPNEDA)

Solar energy — Madhya Pradesh Solar Energy Policy 2022 / MP Rooftop Solar Programme (MPUVNL / MPNEDA)

For residential, commercial, industrial, agricultural, institutional in Madhya Pradesh — this guide covers the Madhya Pradesh Solar Energy Policy 2022 / MP Rooftop Solar Programme (MPUVNL / MPNEDA). Administered by MP Urja Vikas Nigam Ltd (MPUVNL) / MP New and Renewable Energy Development Agency (MPNEDA). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • MP state additional: Rs.10,000–Rs.15,000 residential top-up (MPUVNL)
  • Agricultural solar pumps (PM KUSUM): 60% total
  • MP Solar Policy 2022: banking charges waived
  • wheeling charges concessional for captive projects

Authority and scope

  • Government body: MP Urja Vikas Nigam Ltd (MPUVNL) / MP New and Renewable Energy Development Agency (MPNEDA)
  • Nodal agency: MPUVNL / MPNEDA
  • Eligible for: residential, commercial, industrial, agricultural, institutional
  • Installation type: Rooftop on-grid + ground-mounted + agrivoltaic

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction; BPL and tribal (Adivasi) beneficiaries get priority for state top-up.
  • Disbursement timeline: 30–60 days post-commissioning
  • Disbursement mode: DBT via MPUVNL portal; central CFA via DISCOM
  • Maximum capacity: 1000 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: MPERC (Net Metering Regulations for Grid Connected Renewable Energy Sources) 2015 (amended 2023). 1 kW–1 MW eligible. DISCOMs: MPEZ (East), MPZ (West: Indore, Bhopal), MPP (Panchayat/rural areas).
  • Gross metering policy: MPERC gross metering for systems >500 kW. PPA-based tariff for utility-scale projects.
  • Hybrid policy: MP Hybrid Energy Policy 2022: solar + wind co-location in Ratlam, Neemuch, Mandsaur districts.
  • DISCOM requirements: MPPKVVCL (Madhya Pradesh Poorv Kshetra Vidyut Vitaran Co.): East MP — Jabalpur, Sagar, Rewa. MPPKVVCL (West Zone): Bhopal, Gwalior, Chambal. MPMaVVCL (Madhya Pradesh Madhya Kshetra): Indore, Ujjain, Dewas.

How to apply

Apply on MPUVNL portal or pmsuryaghar.gov.in

Select zone DISCOM and upload documents

DISCOM feasibility check (auto-approved up to 10 kW)

MPNEDA-empanelled vendor installation

DISCOM inspection + net meter

State subsidy + central CFA credited via DBT

Documents required

  • Aadhaar card
  • Electricity bill
  • Khasra/Khatoni (land ownership)
  • Bank account details
  • Passport photo

Additional details

  • Scheme budget: MP target: 20 GW RE by 2030; Rewa Solar Park (750 MW) pioneered ultra-low tariff. PM Surya Ghar: 1.2 lakh+ registrations.
  • Target beneficiaries: All MP consumers. Key cities: Bhopal (462xxx), Indore (452xxx), Jabalpur (482xxx), Gwalior (474xxx), Ujjain (456xxx), Rewa (486xxx). Rewa and Neemuch districts: top solar zones.
  • Progress: MP: 5+ GW solar installed (April 2025). Rewa Ultra Mega Solar Park (750 MW) was India's first ultra-low tariff park at Rs.2.97/unit (2017).