Back to subsidies

For Farmer, Agricultural

PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan)

All India · Ministry of New and Renewable Energy (MNRE)

Solar energy — PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan)

For Farmer, Agricultural in All India — this guide covers the PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan). Administered by Ministry of New and Renewable Energy (MNRE). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Authority and scope

  • Government body: Ministry of New and Renewable Energy (MNRE)
  • Nodal agency: State Nodal Agencies (SNAs)
  • Eligible for: Farmer, Agricultural
  • Installation type: Rooftop Solar

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: EWS/Low Income preference
  • Disbursement timeline: 30-90
  • Disbursement mode: Direct Benefit Transfer (DBT)

Net metering and technical rules

  • Net metering availability is not listed.

How to apply

0312)/kWh for the procurement of 56 MW of solar power under Component C2

0323)/kWh for the procurement of 12 MW

3 GW of non-fossil capacity in the financial year

0 to Include 10 GW Agrivoltaics The second phase of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-K

0 to Have 10 GW Agrivoltaics Component: Pralhad Joshi The second phase of the Pradhan Mantri Kisan Urja Suraksha evam Ut

2 MTPA Li-ion Battery Recycling Facility Jun 3, 2026 MNRE Asks Solar Cell, Module Manufacturers to Submit Monthly Price

Documents required

  • Aadhaar Card
  • Electricity Bill
  • Bank Account Details

Additional details

  • Target capacity: 127 MW