For residential, commercial, agricultural, eco-tourism, off-grid remote
Sikkim Solar Energy Policy 2022 / Sikkim Rooftop Solar Programme (SIMFED / DoE)
Sikkim · Sikkim Renewable Energy Development Agency (SREDA) / Sikkim Power Department
For residential, commercial, agricultural, eco-tourism, off-grid remote in Sikkim — this guide covers the Sikkim Solar Energy Policy 2022 / Sikkim Rooftop Solar Programme (SIMFED / DoE). Administered by Sikkim Renewable Energy Development Agency (SREDA) / Sikkim Power Department. Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- additional 10% NE special category
- Sikkim state additional: 25% state subsidy (organic premium materials supported)
- Off-grid border solar: 90% subsidy
- Agricultural (organic farming) solar pumps: 80% total
Authority and scope
- Government body: Sikkim Renewable Energy Development Agency (SREDA) / Sikkim Power Department
- Nodal agency: SREDA / Sikkim Power Department
- Eligible for: residential, commercial, agricultural, eco-tourism, off-grid remote
- Installation type: Rooftop on-grid + off-grid (high-altitude Lachen, Lachung, Thangu areas)
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; eco-tourism operators get additional green tourism solar incentive.
- Disbursement timeline: 45–90 days post-commissioning
- Disbursement mode: DBT via SREDA/Power Dept.; state component via SREDA
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: SERCM Net Metering Regulations 2019 (amended 2022). 1 kW–500 kW. Single DISCOM: Sikkim Power Department (state-run) — all Sikkim.
- Gross metering policy: SERCM gross metering for >500 kW.
- Hybrid policy: Sikkim Solar + Hydro hybrid: Teesta river system — large hydro + rooftop solar combination for green Sikkim mission.
- DISCOM requirements: Sikkim Power Department: Single DISCOM for all Sikkim. High-altitude border areas: off-grid solar + BESS systems.
How to apply
Apply on SREDA portal or pmsuryaghar.gov.in
Sikkim Power Dept. feasibility check
SREDA-empanelled vendor selection
Installation + net meter
Power Dept. inspection + commissioning
Enhanced central CFA + state subsidy via DBT
Documents required
- Aadhaar card / Sikkim identity proof
- Electricity bill (Power Dept. consumer number)
- Property documents (land pass book)
- Bank account details
- Eco-tourism licence (for eco-tourism incentive)
Additional details
- Scheme budget: Sikkim RE target: 250 MW by 2025 (organic state — strict environmental standards). NE special category PM Surya Ghar: +10% CFA applicable.
- Target beneficiaries: All Sikkim consumers. Key areas: Gangtok (737xxx), Namchi (737xxx), Geyzing (737xxx), Mangan (737xxx). China/Nepal border areas: strategic off-grid solar + battery.
- Progress: Sikkim: 100+ MW solar installed (April 2025). World's first fully organic state — all solar must be from eco-friendly materials. Sikkim's solar adoption complementing large hydro capacity.