Manipur Solar Energy Policy 2015 (Updated 2022) / Manipur Rooftop Solar Programme (MANIREDA)

Manipur · Manipur Renewable Energy Development Agency (MANIREDA) / MSPCL (Manipur State Power Company Ltd.)

Solar energy — Manipur Solar Energy Policy 2015 (Updated 2022) / Manipur Rooftop Solar Programme (MANIREDA)

For residential, commercial, agricultural, off-grid remote, institutional in Manipur — this guide covers the Manipur Solar Energy Policy 2015 (Updated 2022) / Manipur Rooftop Solar Programme (MANIREDA). Administered by Manipur Renewable Energy Development Agency (MANIREDA) / MSPCL (Manipur State Power Company Ltd.). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • additional 10% NE special category
  • Manipur state additional: 25% state subsidy
  • Agricultural solar pumps: 80% total (NE enhanced)
  • Remote hill tribal: 90% off-grid subsidy

Authority and scope

  • Government body: Manipur Renewable Energy Development Agency (MANIREDA) / MSPCL (Manipur State Power Company Ltd.)
  • Nodal agency: MANIREDA (Manipur Renewable Energy Development Agency)
  • Eligible for: residential, commercial, agricultural, off-grid remote, institutional
  • Installation type: Rooftop on-grid + floating solar (Loktak) + off-grid (hill districts)

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction; Naga, Kuki, Meitei tribal communities get off-grid priority.
  • Disbursement timeline: 45–90 days post-commissioning
  • Disbursement mode: DBT via MANIREDA/MSPCL; state component via MANIREDA
  • Maximum capacity: 500 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: MERC (Manipur Electricity Regulatory Commission) Net Metering Regulations
  • 1 kW–500 kW. Single DISCOM: MSPCL (Manipur State Power Company Ltd.).
  • Gross metering policy: MERC gross metering for >500 kW. PPA-based for utility-scale.
  • Hybrid policy: Manipur Solar + Hydro: Manipur has 13 rivers — solar + run-of-river micro-hydro hybrid for 24x7 power.
  • DISCOM requirements: MSPCL: Single DISCOM for all Manipur. Hill district remote areas: off-grid microgrids via DDUGJY.

How to apply

Apply on MANIREDA portal or pmsuryaghar.gov.in

MSPCL feasibility check

MANIREDA-empanelled vendor selection

Installation + net meter

MSPCL inspection + commissioning

Enhanced central CFA + state subsidy via DBT

Documents required

  • Aadhaar card
  • Electricity bill
  • Property documents (local chieftain/village authority letter for hill areas)
  • Bank account details
  • Tribal certificate

Additional details

  • Scheme budget: Manipur RE target: 400 MW by
  • NE special category: enhanced PM Surya Ghar CFA + state top-up.
  • Target beneficiaries: All Manipur consumers. Key areas: Imphal East/West (795xxx), Thoubal (795xxx), Bishnupur (795xxx), Churachandpur (795xxx), Senapati (795xxx). Tribal hill districts: off-grid solar critical.
  • Progress: Manipur: 100+ MW solar installed (April 2025). Loktak floating solar project (5 MW pilot on Loktak Lake) by MANIREDA. 300+ remote hill villages electrified via solar.