For residential, commercial, agricultural, tribal/rural off-grid, institutional
Jharkhand Solar Energy Policy 2022 / Jharkhand Rooftop Solar Programme (JREDA)
Jharkhand · Jharkhand Renewable Energy Development Agency (JREDA) / JBVNL (Jharkhand Bijli Vitaran Nigam Ltd.)
For residential, commercial, agricultural, tribal/rural off-grid, institutional in Jharkhand — this guide covers the Jharkhand Solar Energy Policy 2022 / Jharkhand Rooftop Solar Programme (JREDA). Administered by Jharkhand Renewable Energy Development Agency (JREDA) / JBVNL (Jharkhand Bijli Vitaran Nigam Ltd.). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- Jharkhand state additional: 30% state subsidy for BPL/tribal
- Agricultural solar pumps (PM KUSUM): 60% total
- Tribal off-grid solar (Sour Urja): 90% subsidy (central
- state combined)
Authority and scope
- Government body: Jharkhand Renewable Energy Development Agency (JREDA) / JBVNL (Jharkhand Bijli Vitaran Nigam Ltd.)
- Nodal agency: JREDA (Jharkhand Renewable Energy Development Agency)
- Eligible for: residential, commercial, agricultural, tribal/rural off-grid, institutional
- Installation type: Rooftop on-grid + off-grid (tribal hamlets) + mine reclamation solar
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: BPL/tribal (ST) consumers: 30% additional state subsidy. No restriction for others.
- Disbursement timeline: 30–60 days post-commissioning
- Disbursement mode: DBT via JREDA/JBVNL; state component via JREDA
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: JSERC Net Metering Regulations 2016 (amended 2022). 1 kW–500 kW. Single DISCOM: JBVNL (all Jharkhand). Mining areas (Dhanbad, Bokaro): separate BCCL/ECL microgrids in coal fields.
- Gross metering policy: JSERC gross metering for >500 kW; PPA-based tariff.
- Hybrid policy: Jharkhand Solar + Coal Mine Reclamation: solar on abandoned coal mines (pilot at Jharia, Dhanbad).
- DISCOM requirements: JBVNL: Single DISCOM for entire Jharkhand. Mining colonies: BCCL/ECL subsidiary power distribution.
How to apply
Apply on JREDA portal or pmsuryaghar.gov.in
JBVNL feasibility check
JREDA-empanelled vendor selection
Installation + net meter
JBVNL inspection + commissioning
State subsidy + central CFA via DBT
Documents required
- Aadhaar card
- Electricity bill
- ST/BPL certificate (for priority)
- Property documents (Khasra)
- Bank account details
Additional details
- Scheme budget: Jharkhand RE target: 2,700 MW solar by
- Sour Urja Vikas Yojana: solar for tribal hamlets.
- Target beneficiaries: All Jharkhand consumers + tribal hamlets (Adivasi). Key areas: Ranchi (834xxx), Jamshedpur (831xxx), Dhanbad (828xxx), Bokaro (827xxx), Hazaribagh (825xxx), Deoghar (814xxx).
- Progress: Jharkhand: 800+ MW solar installed (April 2025). 7,000+ tribal villages electrified via off-grid solar under Sour Urja Vikas Yojana.