For residential, commercial, industrial, agricultural, institutional
Odisha Solar Energy Policy 2022 / Odisha Rooftop Solar Programme (OREDA)
Odisha · Odisha Renewable Energy Development Agency (OREDA) / GRIDCO / TPCODL / CESU
For residential, commercial, industrial, agricultural, institutional in Odisha — this guide covers the Odisha Solar Energy Policy 2022 / Odisha Rooftop Solar Programme (OREDA). Administered by Odisha Renewable Energy Development Agency (OREDA) / GRIDCO / TPCODL / CESU. Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- Odisha state additional: 25% state subsidy for residential (OREDA)
- Agricultural solar pumps (PM KUSUM): 60% total
- Odisha Solar Policy 2022: wheeling charges waived 5 years for captive solar
Authority and scope
- Government body: Odisha Renewable Energy Development Agency (OREDA) / GRIDCO / TPCODL / CESU
- Nodal agency: OREDA (Odisha Renewable Energy Development Agency)
- Eligible for: residential, commercial, industrial, agricultural, institutional
- Installation type: Rooftop on-grid + floating solar (Hirakud) + ground-mounted
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; BPL and tribal consumers (ST) get state subsidy priority.
- Disbursement timeline: 30–60 days post-commissioning
- Disbursement mode: DBT via OREDA/DISCOM portal; state component via OREDA
- Maximum capacity: 1000 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: OERC Distributed Generation and Net Metering Regulations 2016 (amended 2023). 1 kW–1 MW. DISCOMs: TPCODL (Central Odisha: Bhubaneswar, Cuttack), TPNODL (North), TPSODL (South), TPWODL (West: Sambalpur, Rourkela).
- Gross metering policy: OERC gross metering for >1 MW. GRIDCO acts as state transmission and bulk power trading company.
- Hybrid policy: Odisha RE Policy 2022: solar + wind in Kendujhar and Mayurbhanj districts.
- DISCOM requirements: TPCODL (Central: Bhubaneswar, Cuttack, Puri), TPNODL (North: Balasore, Bhadrak, Keonjhar), TPSODL (South: Berhampur, Koraput, Rayagada), TPWODL (West: Sambalpur, Rourkela, Sundargarh).
How to apply
Apply on OREDA portal or pmsuryaghar.gov.in
Select zone DISCOM (TPCODL/TPNODL/TPSODL/TPWODL)
OREDA-empanelled vendor installation
Net meter + DISCOM inspection
State subsidy + central CFA via DBT
Documents required
- Aadhaar card
- Electricity bill (consumer number)
- Property documents (ROR/Patta)
- Bank account details
- Caste certificate (for ST priority)
Additional details
- Scheme budget: Odisha RE target: 10,000 MW by 2030; 4,000 MW solar. PM Surya Ghar: 70,000+ registrations.
- Target beneficiaries: All Odisha consumers. Key areas: Bhubaneswar (751xxx), Cuttack (753xxx), Rourkela (769xxx), Berhampur (760xxx), Sambalpur (768xxx), Brahmapur (760xxx).
- Progress: Odisha: 2+ GW solar installed (April 2025). NTPC's Odisha solar parks progressing. 100 MW floating solar at Hirakud reservoir in progress.