For residential, commercial, agricultural, institutional, off-grid church/community
Mizoram Solar Energy Policy 2019 / Mizoram Rooftop Solar Programme (ZEDA / MPDO)
Mizoram · Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.)
For residential, commercial, agricultural, institutional, off-grid church/community in Mizoram — this guide covers the Mizoram Solar Energy Policy 2019 / Mizoram Rooftop Solar Programme (ZEDA / MPDO). Administered by Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- additional 10% NE special category
- Mizoram state additional: 25% state subsidy (ZEDA)
- Agricultural solar pumps: 80% total (NE enhanced)
- Community/church off-grid solar: 90% subsidy
Authority and scope
- Government body: Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.)
- Nodal agency: ZEDA (Zoram Energy Development Agency)
- Eligible for: residential, commercial, agricultural, institutional, off-grid church/community
- Installation type: Rooftop on-grid + off-grid (remote hill villages) + community church solar
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; Mizo tribal communities and church institutions get community off-grid priority.
- Disbursement timeline: 45–90 days post-commissioning
- Disbursement mode: DBT via ZEDA/MzPDCL; state component via ZEDA
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: MZERC Net Metering Regulations
- 1 kW–500 kW. Single DISCOM: MzPDCL (Mizoram Power Distribution Corp. Ltd.).
- Gross metering policy: MZERC gross metering for >500 kW.
- Hybrid policy: Mizoram Solar + Micro-hydro: Tlawng, Tuivai river systems — solar daytime + micro-hydro peaking combination.
- DISCOM requirements: MzPDCL: Single DISCOM for all Mizoram. Remote Lawngtlai, Mamit districts: off-grid microgrids.
How to apply
Apply on ZEDA portal or pmsuryaghar.gov.in
MzPDCL feasibility check
ZEDA-empanelled vendor selection
Installation + net meter
MzPDCL inspection + commissioning
Enhanced central CFA + state subsidy via DBT
Documents required
- Aadhaar card
- Electricity bill
- Property documents (local land holding certificate)
- Bank account details
- Church/community institution registration certificate (for community solar)
Additional details
- Scheme budget: Mizoram RE target: 370 MW by
- NE special category PM Surya Ghar: +10% CFA applicable.
- Target beneficiaries: All Mizoram consumers. Key areas: Aizawl (796xxx), Lunglei (796xxx), Champhai (796xxx), Kolasib (796xxx). Church and community buildings: off-grid solar microgrids (Mizoram has high community solar adoption).
- Progress: Mizoram: 80+ MW solar installed (April 2025). Mizoram has 90%+ literacy and high community awareness — solar adoption per capita among best in NE India.