Mizoram Solar Energy Policy 2019 / Mizoram Rooftop Solar Programme (ZEDA / MPDO)

Mizoram · Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.)

Solar energy — Mizoram Solar Energy Policy 2019 / Mizoram Rooftop Solar Programme (ZEDA / MPDO)

For residential, commercial, agricultural, institutional, off-grid church/community in Mizoram — this guide covers the Mizoram Solar Energy Policy 2019 / Mizoram Rooftop Solar Programme (ZEDA / MPDO). Administered by Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • additional 10% NE special category
  • Mizoram state additional: 25% state subsidy (ZEDA)
  • Agricultural solar pumps: 80% total (NE enhanced)
  • Community/church off-grid solar: 90% subsidy

Authority and scope

  • Government body: Zoram Energy Development Agency (ZEDA) / MzPDCL (Mizoram Power Distribution Corp. Ltd.)
  • Nodal agency: ZEDA (Zoram Energy Development Agency)
  • Eligible for: residential, commercial, agricultural, institutional, off-grid church/community
  • Installation type: Rooftop on-grid + off-grid (remote hill villages) + community church solar

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction; Mizo tribal communities and church institutions get community off-grid priority.
  • Disbursement timeline: 45–90 days post-commissioning
  • Disbursement mode: DBT via ZEDA/MzPDCL; state component via ZEDA
  • Maximum capacity: 500 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: MZERC Net Metering Regulations
  • 1 kW–500 kW. Single DISCOM: MzPDCL (Mizoram Power Distribution Corp. Ltd.).
  • Gross metering policy: MZERC gross metering for >500 kW.
  • Hybrid policy: Mizoram Solar + Micro-hydro: Tlawng, Tuivai river systems — solar daytime + micro-hydro peaking combination.
  • DISCOM requirements: MzPDCL: Single DISCOM for all Mizoram. Remote Lawngtlai, Mamit districts: off-grid microgrids.

How to apply

Apply on ZEDA portal or pmsuryaghar.gov.in

MzPDCL feasibility check

ZEDA-empanelled vendor selection

Installation + net meter

MzPDCL inspection + commissioning

Enhanced central CFA + state subsidy via DBT

Documents required

  • Aadhaar card
  • Electricity bill
  • Property documents (local land holding certificate)
  • Bank account details
  • Church/community institution registration certificate (for community solar)

Additional details

  • Scheme budget: Mizoram RE target: 370 MW by
  • NE special category PM Surya Ghar: +10% CFA applicable.
  • Target beneficiaries: All Mizoram consumers. Key areas: Aizawl (796xxx), Lunglei (796xxx), Champhai (796xxx), Kolasib (796xxx). Church and community buildings: off-grid solar microgrids (Mizoram has high community solar adoption).
  • Progress: Mizoram: 80+ MW solar installed (April 2025). Mizoram has 90%+ literacy and high community awareness — solar adoption per capita among best in NE India.