For residential, commercial, industrial, institutional
Puducherry Solar Energy Policy 2021 / Puducherry Rooftop Solar Programme (PEDA)
Puducherry, Karaikal, Mahe, Yanam · Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department)
For residential, commercial, industrial, institutional in Puducherry, Karaikal, Mahe, Yanam — this guide covers the Puducherry Solar Energy Policy 2021 / Puducherry Rooftop Solar Programme (PEDA). Administered by Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- additional 10% special category UT
- Puducherry state additional: 20% state subsidy (PEDA)
- Agricultural solar pumps: 60% total
- Puducherry govt buildings: 100% solar mandatory under GO 2022
Authority and scope
- Government body: Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department)
- Nodal agency: PEDA (Puducherry Energy Development Agency)
- Eligible for: residential, commercial, industrial, institutional
- Installation type: Rooftop on-grid (primary); coastal solar study ongoing
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction. All 4 enclaves covered under unified PEDA scheme.
- Disbursement timeline: 30–45 days post-commissioning
- Disbursement mode: DBT via PEDA; enhanced central CFA via Electricity Department
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: JERC (Puducherry) Net Metering Regulations
- 1 kW–500 kW. DISCOM: Electricity Department, Govt. of Puducherry (for main enclave). Karaikal: PREPP. Mahe: KSEB overlap area. Yanam: APEPDCL territory (special arrangement).
- Gross metering policy: JERC gross metering for >500 kW. PPA-based for utility-scale.
- Hybrid policy: Puducherry Coastal Solar: offshore floating solar study on Chunnambar Boat House reservoir.
- DISCOM requirements: Puducherry Electricity Dept (main enclave), PREPP (Karaikal), KSEB (Mahe — Kerala electricity), APEPDCL (Yanam — AP electricity).
How to apply
Apply on PEDA portal or pmsuryaghar.gov.in
Select enclave region (Puducherry / Karaikal / Mahe / Yanam)
PEDA-empanelled vendor selection
Installation + net meter
Electricity department inspection + commissioning
Enhanced central CFA + state subsidy via DBT
Documents required
- Aadhaar card
- Electricity bill (consumer number)
- Property documents (Patta)
- Bank account details
- Enclave region proof (for Karaikal/Mahe/Yanam residents)
Additional details
- Scheme budget: Puducherry RE target: 250 MW by
- PM Surya Ghar special category: +10% CFA applicable.
- Target beneficiaries: All Puducherry consumers across 4 enclave regions. Key areas: Puducherry city (605xxx), Karaikal (609xxx), Mahe (673xxx, Kerala border), Yanam (533xxx, AP border).
- Progress: Puducherry: 80+ MW solar installed (April 2025). Puducherry being a coastal UT has high solar irradiance. PM Surya Ghar: 15,000+ registrations.