Back to subsidies

For residential, commercial, industrial, institutional

Puducherry Solar Energy Policy 2021 / Puducherry Rooftop Solar Programme (PEDA)

Puducherry, Karaikal, Mahe, Yanam · Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department)

Solar energy — Puducherry Solar Energy Policy 2021 / Puducherry Rooftop Solar Programme (PEDA)

For residential, commercial, industrial, institutional in Puducherry, Karaikal, Mahe, Yanam — this guide covers the Puducherry Solar Energy Policy 2021 / Puducherry Rooftop Solar Programme (PEDA). Administered by Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • additional 10% special category UT
  • Puducherry state additional: 20% state subsidy (PEDA)
  • Agricultural solar pumps: 60% total
  • Puducherry govt buildings: 100% solar mandatory under GO 2022

Authority and scope

  • Government body: Puducherry Energy Development Agency (PEDA) / PREPP (Puducherry Electricity Department)
  • Nodal agency: PEDA (Puducherry Energy Development Agency)
  • Eligible for: residential, commercial, industrial, institutional
  • Installation type: Rooftop on-grid (primary); coastal solar study ongoing

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction. All 4 enclaves covered under unified PEDA scheme.
  • Disbursement timeline: 30–45 days post-commissioning
  • Disbursement mode: DBT via PEDA; enhanced central CFA via Electricity Department
  • Maximum capacity: 500 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: JERC (Puducherry) Net Metering Regulations
  • 1 kW–500 kW. DISCOM: Electricity Department, Govt. of Puducherry (for main enclave). Karaikal: PREPP. Mahe: KSEB overlap area. Yanam: APEPDCL territory (special arrangement).
  • Gross metering policy: JERC gross metering for >500 kW. PPA-based for utility-scale.
  • Hybrid policy: Puducherry Coastal Solar: offshore floating solar study on Chunnambar Boat House reservoir.
  • DISCOM requirements: Puducherry Electricity Dept (main enclave), PREPP (Karaikal), KSEB (Mahe — Kerala electricity), APEPDCL (Yanam — AP electricity).

How to apply

Apply on PEDA portal or pmsuryaghar.gov.in

Select enclave region (Puducherry / Karaikal / Mahe / Yanam)

PEDA-empanelled vendor selection

Installation + net meter

Electricity department inspection + commissioning

Enhanced central CFA + state subsidy via DBT

Documents required

  • Aadhaar card
  • Electricity bill (consumer number)
  • Property documents (Patta)
  • Bank account details
  • Enclave region proof (for Karaikal/Mahe/Yanam residents)

Additional details

  • Scheme budget: Puducherry RE target: 250 MW by
  • PM Surya Ghar special category: +10% CFA applicable.
  • Target beneficiaries: All Puducherry consumers across 4 enclave regions. Key areas: Puducherry city (605xxx), Karaikal (609xxx), Mahe (673xxx, Kerala border), Yanam (533xxx, AP border).
  • Progress: Puducherry: 80+ MW solar installed (April 2025). Puducherry being a coastal UT has high solar irradiance. PM Surya Ghar: 15,000+ registrations.