Telangana Solar Energy Policy 2023 / Telangana Rooftop Solar Programme (TSREDCO)

Telangana · Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL)

Solar energy — Telangana Solar Energy Policy 2023 / Telangana Rooftop Solar Programme (TSREDCO)

For residential, commercial, industrial, agricultural, institutional in Telangana — this guide covers the Telangana Solar Energy Policy 2023 / Telangana Rooftop Solar Programme (TSREDCO). Administered by Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • Central CFA (PM Surya Ghar): up to Rs.78,000
  • Telangana state additional: Rs.10,000–Rs.15,000 residential top-up (TSREDCO)
  • Agricultural solar pumps (PM KUSUM): 60% total
  • Telangana Farmers (YSR-style): free daytime electricity for farmers (9 hours/day) — state budget funded

Authority and scope

  • Government body: Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL)
  • Nodal agency: TSREDCO (Telangana State Renewable Energy Development Corporation Ltd.)
  • Eligible for: residential, commercial, industrial, agricultural, institutional
  • Installation type: Rooftop + ground-mounted + floating solar

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: No income restriction; priority for BPL and SC/ST under state component.
  • Disbursement timeline: 30–60 days post-commissioning
  • Disbursement mode: DBT via TSREDCO portal; central CFA via DISCOM
  • Maximum capacity: 1000 kW

Net metering and technical rules

  • Net metering is available under this scheme.
  • Net metering policy: TSERC (Renewable Energy Sources) Regulations 2015 (amended 2023). 1 kW–1 MW net metering. DISCOMs: TSSPDCL (South Telangana: Hyderabad, Rangareddy, Mahbubnagar, Nalgonda, Khammam), TSNPDCL (North Telangana: Warangal, Karimnagar, Nizamabad, Adilabad, Medak).
  • Gross metering policy: TSERC gross metering for systems >1 MW; feed-in tariff via competitive bidding.
  • Hybrid policy: Telangana RE Policy 2023 permits solar + wind hybrid in Adilabad and Nizamabad districts.
  • DISCOM requirements: TSSPDCL (South Telangana, Hyderabad metro) or TSNPDCL (North Telangana) connection required.

How to apply

Apply on TSREDCO portal or pmsuryaghar.gov.in

DISCOM feasibility check (TSSPDCL or TSNPDCL)

TSREDCO-empanelled vendor selection

Installation + net meter

DISCOM inspection + commissioning

State + central CFA via DBT

Documents required

  • Aadhaar card
  • Electricity bill (SC number)
  • Property documents (Pahani/7-1 extract)
  • Bank account details
  • Passport photo

Additional details

  • Scheme budget: Telangana target: 20 GW RE by 2030; 10 GW solar. PM Surya Ghar: 1.5 lakh+ registrations.
  • Target beneficiaries: All Telangana consumers. Key areas: Hyderabad (500xxx), Warangal (506xxx), Nizamabad (503xxx), Karimnagar (505xxx), Khammam (507xxx), Nalgonda (508xxx).
  • Progress: Telangana: 6+ GW solar installed (April 2025). Ramagundam Floating Solar (100 MW) — one of India's largest floating solar plants.