For residential, commercial, industrial, agricultural, institutional
Telangana Solar Energy Policy 2023 / Telangana Rooftop Solar Programme (TSREDCO)
Telangana · Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL)
For residential, commercial, industrial, agricultural, institutional in Telangana — this guide covers the Telangana Solar Energy Policy 2023 / Telangana Rooftop Solar Programme (TSREDCO). Administered by Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- Telangana state additional: Rs.10,000–Rs.15,000 residential top-up (TSREDCO)
- Agricultural solar pumps (PM KUSUM): 60% total
- Telangana Farmers (YSR-style): free daytime electricity for farmers (9 hours/day) — state budget funded
Authority and scope
- Government body: Telangana State Renewable Energy Development Corporation (TSREDCO) / Telangana DISCOM (TSSPDCL / TSNPDCL)
- Nodal agency: TSREDCO (Telangana State Renewable Energy Development Corporation Ltd.)
- Eligible for: residential, commercial, industrial, agricultural, institutional
- Installation type: Rooftop + ground-mounted + floating solar
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; priority for BPL and SC/ST under state component.
- Disbursement timeline: 30–60 days post-commissioning
- Disbursement mode: DBT via TSREDCO portal; central CFA via DISCOM
- Maximum capacity: 1000 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: TSERC (Renewable Energy Sources) Regulations 2015 (amended 2023). 1 kW–1 MW net metering. DISCOMs: TSSPDCL (South Telangana: Hyderabad, Rangareddy, Mahbubnagar, Nalgonda, Khammam), TSNPDCL (North Telangana: Warangal, Karimnagar, Nizamabad, Adilabad, Medak).
- Gross metering policy: TSERC gross metering for systems >1 MW; feed-in tariff via competitive bidding.
- Hybrid policy: Telangana RE Policy 2023 permits solar + wind hybrid in Adilabad and Nizamabad districts.
- DISCOM requirements: TSSPDCL (South Telangana, Hyderabad metro) or TSNPDCL (North Telangana) connection required.
How to apply
Apply on TSREDCO portal or pmsuryaghar.gov.in
DISCOM feasibility check (TSSPDCL or TSNPDCL)
TSREDCO-empanelled vendor selection
Installation + net meter
DISCOM inspection + commissioning
State + central CFA via DBT
Documents required
- Aadhaar card
- Electricity bill (SC number)
- Property documents (Pahani/7-1 extract)
- Bank account details
- Passport photo
Additional details
- Scheme budget: Telangana target: 20 GW RE by 2030; 10 GW solar. PM Surya Ghar: 1.5 lakh+ registrations.
- Target beneficiaries: All Telangana consumers. Key areas: Hyderabad (500xxx), Warangal (506xxx), Nizamabad (503xxx), Karimnagar (505xxx), Khammam (507xxx), Nalgonda (508xxx).
- Progress: Telangana: 6+ GW solar installed (April 2025). Ramagundam Floating Solar (100 MW) — one of India's largest floating solar plants.