Back to subsidies

For All

National Solar Mission / Jawaharlal Nehru National Solar Mission

All India · Ministry of New and Renewable Energy (MNRE)

Solar energy — National Solar Mission / Jawaharlal Nehru National Solar Mission

For All in All India — this guide covers the National Solar Mission / Jawaharlal Nehru National Solar Mission. Administered by Ministry of New and Renewable Energy (MNRE). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Authority and scope

  • Government body: Ministry of New and Renewable Energy (MNRE)
  • Nodal agency: MNRE / SECI
  • Eligible for: All
  • Installation type: Rooftop Solar

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: EWS/Low Income preference
  • Disbursement timeline: 30-90
  • Disbursement mode: Direct Benefit Transfer (DBT)

Net metering and technical rules

  • Net metering availability is not listed.

How to apply

The policy is aimed at ensuring reliable power supply and a sustainable energy mix for

3 GW of Solar Tendered and 1

77 MW of solar was tendered and 1

046)/kWh mark in the 250 MW Bhadla Phase IV Solar Park auction under the National Solar Mission (NSM)

1 MW of Rooftop Solar The Himachal Pradesh Energy Development Agency (HREDA) tendered 1

15/kWh Solar tariff in India touched a new low with Solairedirect’s winning bid of Rs

0486)/kWh, which is 4

0494)/kWh (levelized

Documents required

  • Photo

Additional details

  • Target capacity: 750 MW