Back to subsidies

For Residential, Institutional, Social

Rooftop Solar Phase II (Grid Connected)

All India · Ministry of New and Renewable Energy (MNRE)

Solar energy — Rooftop Solar Phase II (Grid Connected)

For Residential, Institutional, Social in All India — this guide covers the Rooftop Solar Phase II (Grid Connected). Administered by Ministry of New and Renewable Energy (MNRE). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.

Subsidy benefits

  • ₹2.82/kW, 40%

Authority and scope

  • Government body: Ministry of New and Renewable Energy (MNRE)
  • Nodal agency: SECI / State DISCOMs
  • Eligible for: Residential, Institutional, Social
  • Installation type: Rooftop Solar

Eligibility and disbursement

  • Open to multiple consumer categories.
  • Income restrictions: EWS/Low Income preference
  • Disbursement timeline: 30-90
  • Disbursement mode: Direct Benefit Transfer (DBT)
  • Subsidy rate: up to 40%

Net metering and technical rules

  • Net metering availability is not listed.

How to apply

5 MW of Rooftop Solar Projects at Delhi University The Solar Energy Corporation of India (SECI) has invited bids to set

5 MW of grid-connected rooftop solar projects at the University of Delhi’s North Campus under

4 MW Rooftop Solar Auction The Vijayawada Division of the South Central Railway has announced the winner of the auction

4 MW of Rooftop Solar Projects in Andhra Pradesh The Ministry of Railways has issued a tender to set up 1,445 kW of grid

82/kWh Tariff for Surplus Rooftop Solar Power in FY 2027 The Maharashtra Electricity Regulatory Commission (MERC) has ap

030)/kWh for surplus rooftop solar power, along with variable

5 Million Annually By Going Solar Large industrial consumers with high power consumption are shifting to solar to benefi

5 MW Rooftop Solar Systems at Thermal Plants Rajasthan Rajya Vidyut Utpadan Nigam (RRVUNL) has invited bids to install 4

Documents required

  • Aadhaar