For residential, commercial, agricultural, off-grid remote tribal, institutional
Tripura Solar Energy Policy 2015 (Revised 2022) / Tripura Rooftop Solar Programme (TREDA)
Tripura · Tripura Renewable Energy Development Agency (TREDA) / TSECL (Tripura State Electricity Corporation Ltd.)
For residential, commercial, agricultural, off-grid remote tribal, institutional in Tripura — this guide covers the Tripura Solar Energy Policy 2015 (Revised 2022) / Tripura Rooftop Solar Programme (TREDA). Administered by Tripura Renewable Energy Development Agency (TREDA) / TSECL (Tripura State Electricity Corporation Ltd.). Below are subsidy rates, eligibility, technical rules, documents, and scheme process.
Subsidy benefits
- Central CFA (PM Surya Ghar): up to Rs.78,000
- additional 10% NE special category
- Tripura state additional: 20% state subsidy (TREDA)
- Agricultural solar pumps: 50% central
- 30% state = 80% total (NE enhanced rate)
- Tribal off-grid solar: 90% subsidy
Authority and scope
- Government body: Tripura Renewable Energy Development Agency (TREDA) / TSECL (Tripura State Electricity Corporation Ltd.)
- Nodal agency: TREDA (Tripura Renewable Energy Development Agency)
- Eligible for: residential, commercial, agricultural, off-grid remote tribal, institutional
- Installation type: Rooftop on-grid + off-grid (tribal hamlets) + agrivoltaic (rubber plantation areas)
Eligibility and disbursement
- Open to multiple consumer categories.
- Income restrictions: No income restriction; tribal (Borok, Reang) populations get off-grid solar priority.
- Disbursement timeline: 30–60 days post-commissioning
- Disbursement mode: DBT via TREDA/TSECL; state component via TREDA
- Maximum capacity: 500 kW
Net metering and technical rules
- Net metering is available under this scheme.
- Net metering policy: TERC Net Metering Regulations
- 1 kW–500 kW. Single DISCOM: TSECL (Tripura State Electricity Corporation Ltd.) — all Tripura.
- Gross metering policy: TERC gross metering for >500 kW. PPA-based for NTPC/SECI utility projects.
- Hybrid policy: Tripura Solar + Natural Gas hybrid: ONGC Tripura gas fields area — solar daytime + gas peaking combination.
- DISCOM requirements: TSECL: Single DISCOM for all Tripura. Remote tribal areas: off-grid solar microgrids under DDUGJY.
How to apply
Apply on TREDA portal or pmsuryaghar.gov.in
TSECL feasibility check
TREDA-empanelled vendor selection
Installation + net meter
TSECL inspection + commissioning
Enhanced central CFA + state subsidy via DBT
Documents required
- Aadhaar card
- Electricity bill (TSECL consumer number)
- Property documents
- Bank account details
- Tribal certificate (for off-grid priority)
Additional details
- Scheme budget: Tripura RE target: 500 MW by
- NE special category PM Surya Ghar: +10% additional CFA.
- Target beneficiaries: All Tripura consumers. Key areas: Agartala (799xxx), Dharmanagar (799xxx), Udaipur/Gomati (799xxx). Tribal areas: Khumulwng (Tripura Tribal Areas Autonomous District Council) — off-grid solar priority.
- Progress: Tripura: 200+ MW solar installed (April 2025). Tripura depends heavily on natural gas for power; solar reducing gas dependence. 500+ tribal villages electrified via off-grid solar.